Product Notes

WIPPING OR BRUSHING : -
Large components may be wiped down Rags, Sponges, or Brushes soaked in RXSOL-28-1050-025 .Synthetic sponges & brushes should be checked for compatibility with RXSOL-28-1050-025 prior to use. And finally wash the system with water after 2-3 hours on black coating , incase where RXSOL-RC-1011/B dries leaving a coat of white sludge formation wipe out with a cloth and repeat the application then allow to dry. Again wash the system with water. The surface is now ready for primer.

APPLICATION, DOSAGE & CONTROL:-

It is necessary chemically cleaned to remove old rust & scale deposits before treatment.

DIP CLEANING: -
Small parts may be dipped in an open bucket or tank-containing RXSOL-18-1011 after dipping immediately removes the metals parts from bath. Finally wash the system with water on complete drying. Acid proof gloves should be worn during the operation. 

  •  Not expected to burn
  •  Sandblasting not require
  •  Excellent bonding
  •  Extends durability and life of the paints
  •  Easy to apply & simple to control.
  •  Dries completely.
  •  100% active.
  •  Formulated to be very cost effective.
  •  Maintains a protective insoluble tenacious film of iron phosphate.
  •  Can be used neat or diluted with fresh water.

Where useful metals react with environments and are lost usually as oxides. Materials worth billions of rupees are wasted due to corrosion of material every year. It is therefore essential for every one to understand the undergoing principles in order to check corrosion

stock-clearance.png