Product Dose

A. Dosing Procedure Regularly, a volume of 100 ml of the BOILER SLUDGE CONDITIONER should be applied for every ton of water capacity, where oil contamination exists. How ever, in systems where severe oil contamination exists, off-line cleaning is required before the product can be applied. There after, the application should be repeated daily, for a period of two weeks, until oil removal is complete.

B. Feeding Procedure Feed directly to the boiler by using a bypass pot feeder or a suitable chemical injection pump. For low-pressure boilers the solution may be applied to the hot well or the condensate return tank.

Note that BOILER SLUDGE CONDITIONER can be applied as it is or dissolved with other boiler treatment products. 

SAFETY AND HANDLING HANDLING Handle with care. Store in a dry, cool and well ventilated environment.

Environmentally safe, non-toxic product

Highly specialized combined polymer technology

Organic corrosion control

Stops excessive caustic build-up

Avoid hardness scale and sludge deposits

Operates with low dissolved solid levels

Quick, simple and accurate testing 

Drives to the coagulation of the oil droplets and their removal by blow-down. May be combined with other boiler water treatment products. Efficiently prevents the deposition of sludge. Easy to apply and use. 

stock-clearance.png